Allow high-level editors to assign low-lev editors a higher level for a defined area
Allow high-level editors to assign low-lev editors a higher level for a defined area.
In active areas of constructions/modifications of new/existing roads there might be a lot of adjustments of primary roads/highways (L4/5) which a midlevel (L3) have better local knowledge of the progress.
Today we have to request that a set of segments have be opened (lowered level) and later restored.
I propose that a high level (L5/6) editor can assign a user a higher level for a specific area and maybe specific time-period (the same way as a comment can cover an area)
7
votes
![](https://secure.gravatar.com/avatar/d139e038b1881bdb751b4165d1b6848e?size=40&default=https%3A%2F%2Fassets.uvcdn.com%2Fpkg%2Fadmin%2Ficons%2Fuser_70-6bcf9e08938533adb9bac95c3e487cb2a6d4a32f890ca6fdc82e3072e0ea0368.png)